Monday 21 November 2011

Set To Do list:

Thought it was time to write out a to do list so I can work out what I have to do in the two weeks to come prior to the set build. I have sectioned tasks into different categories to help priorotise certain tasks and know when I need to have materials available by. I will work with Amber to order materials of the right quantity, quality and specification. In the immediate future I will look into sourced items and begin the templates as I think these will be fairly easy to do by hand and will be ready for the painting day so we can be as efficient as possible in the time Richard and Debs are available.


The Soldier’s Tale Set To do
Source:
Corrugated iron
Pallets
Other wood needed
Black matting for pallets
Black lino for beneath pros.
Wooden planking
Cabinate/door
Orchestra antique chairs x8 (no arms, not too low)
Music stands
Fabric to cover music stands
Polystyrene
Dust sheets for curtains
Carpet for rostra
Curtain poles
Curtains rings

To buy:
Scenic paint – for aging wood, green/blue/brown/red/ochre/black/white
Black paint for flooring
Muslim/scrim for water texture
Nails
Wood
Masking tape
Hinges for boxes

To do Beforehand:
Make stencils
  • Ramuz
  • Stravinsky
  • No. 1918
  • Music notes
  • Percussion
Plank boxes
Print large maps/text for collage
Age large text/collage
Paint bits of set stuck on
Age wood to be used
Paint floor
Collage floor Dec 2nd – 7th
Alter curtains to correct size
Break down/paint curtains
Breakdown cabinate /door

To do on 3rd/4th December:
Create pros
Make pallets
Felt/carpet rostra 2
Plank rostra 2
Attach iron to rostra 2
Fix pallets together
Fix curtain poles
Create pulley system

To do on 5th/6th December:
Stencil Pallets
Collage pros
Paint pros
Paint Pallets
Create water texture – paint







No comments:

Post a Comment